IMIS | Flanders Marine Institute
 

Flanders Marine Institute

Platform for marine research

IMIS

Publications | Institutes | Persons | Datasets | Projects | Maps
[ report an error in this record ] Printer-friendly version

GEMS International nv (GEMS int NV)
www.gems-group.com
This institute is the successor of the institute underneath
Medida Hydrographic Services nv, more

Info  Publications | Projects 
Original name: Geotechnical Engineering and Marine Surveys
Previous name: Medida Hydrographic Services nv, more

Thesaurus terms (8) : Bathymetric surveys; Charts (maps); Consultants; Environmental surveys; Geophysical exploration; Geotechnology; Hydrographic surveying; Suspended solids
Geographical terms (3) : ANE, Belgium, Belgian Coast [Marine Regions]; ASE, Angola [Marine Regions]; MED, Malta [Marine Regions]
Address:
Pathoekeweg 9b04
8000 Brugge
Belgium

Tel.: +32 (0)50 450 220
Fax: +32 (0)50 322 003
E-mail:
 
Type: Commercial

Abstract:
Geotechnical Engineering & Marine Surveys is a specialised geotechnical, geophysical and engineering consultancy. GEMS own and operate a variety of offshore and onshore site investigation and construction monitoring equipment as well as providing data processing, reporting and consultancy services for a large range of projects worldwide. Geotechnical engineering and surveys are performed for a wide range of applications offshore and onshore. Onshore investigation specification, planning and supervision are offered in GEMS' services. Geotechnical site investigation techniques include: vibrocoring, gravity coring, seabed piezocone penetration testing, geotechnical drilling and rock coring. Company policy is towards delivering quality and offering Clients the most technically correct and cost effective geotechnical and survey solutions. By having at our centre a team of highly qualified, experienced and motivated professional engineers, GEMS provides comprehensive geotechnical and surveying site services for offshore, nearshore and onshore projects. Our in-depth experience of planning through to executing site surveys, and the follow-on geotechnical engineering design phases utilising specialist professionals, ensures exceptional quality for Clients. This quality is further enhanced by having a broad base of the latest geotechnical and surveying equipment.

Publications (25)  Top | Projects 
    split up filter
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok. report 1.2: Annual sediment balance April 2010 - March 2011. Versie 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerp. 45 + appendices pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 2.3. Through tide Sediview measurements during spring tide: entrance Deurganckdok - Winter 2012. Versie 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerp. V, 258 pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 2.7. Through tide measurements: Eddy currents during spring tide at DGD winter 2012. version 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerp. VI, 172 pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 1.5. Overview of boundary conditions in the river Scheldt april 2010 - march 2011. version 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerp. IV, 129 pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 2.11. Salt silt and current distribution entrance Deurganckdok: frame measurements and through tide measurements: winter 2012. version 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. VI, 360 pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report: 2.4. Through tide Sediview measurements during neap tide: entrance Deurganckdok Winter 2012. version 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. 268 pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 1.3. Annual sediment balance April 2011 - March 2012. Verie 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. 238 + appendices pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 1.6. Overview of boundary conditions in the river Scheldt April 2011 - March 2012. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. 39 + appendices pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2011). Evaluation of the external effects on the siltation in Deurganckdok: report 1.4: overview of boundary conditions in the river Scheldt April 2009 - March 2010. Versie 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. IV, 118 pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International; Waterbouwkundig Laboratorium (2011). Langdurige monitoring van zout/zoet-verdeling in de haven van Zeebrugge en monitoring van zoutconcentratie, slibconcentratie en hooggeconcentreerde slibsuspensies in de Belgische kustzone: salinity profiling during 2007-2008 in the harbour of Zeebrugge. Versie 2.0. Waterbouwkundig Laboratorium: Antwerpen. III, 18 + appendices pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International; Waterbouwkundig Laboratorium (2011). Uitbreiding studie densiteitsstromingen in de Beneden Zeeschelde in het kader van LTV Meetcampagne naar hooggeconcentreerde slibsuspensies: deelrapport 12: het voorkomen van HCBS lagen in de Beneden-Zeeschelde. Versie 2,0. Waterbouwkundig Laboratorium: Antwerpen. x, 184 pp., more
  • International Marine and Dredging Consultants; GEMS International (2011). Evaluation of the external effects on the siltation in Deurganckdok. Report 1.1: Annual sediment balance April 2009 - March 2010. Version 3.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. VI, 36 + apppendices pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International; Waterbouwkundig Laboratorium (2010). Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing: rapport 2.8: zout- en slibverdeling Deurganckdok april 2009 - maart 2010. Versie 1.0. Waterbouwkundig Laboratorium: Antwerpen. IV, 29 + appendices pp., more
  • International Marine and Dredging Consultants; WL | Delft Hydraulics; GEMS International (2010). Langdurige monitoring van zout/zoet-verdeling in de haven van Zeebrugge en monitoring van zoutconcentratie, slibconcentratie en hooggeconcentreerde slibsuspensies in de Belgische kustzone: deelrapport 8. Rapport over de aanwezigheid van HCBS lagen in de Belgische kustzone. Versie 2.0. Waterbouwkundig Laboratorium: Antwerpen. VII, 192 pp., more
  • International Marine and Dredging Consultants; WL | Delft Hydraulics; GEMS International; Waterbouwkundig Laboratorium (2009). Langdurige metingen Deurganckdok 2: opvolging en analyse aanslibbing: deelrapport 1.14. Sediment jaarbalans 01/04/2007 - 31/03/2008. Versie 3.0. Waterbouwkundig Laboratorium: Antwerpen. IV, 161 pp., more
  • International Marine and Dredging Consultants; WL | Delft Hydraulics; GEMS International (2009). Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing: deelrapport 4.10. Analyse van aanslibbingsprocessen en -invloeden April 2007 - March 2008. Versie 2.0. Waterbouwkundig Laboratorium: Antwerpen. VI, 60 + appendices pp., more
  • GEMS International (2008). Analyse impact baggerboot ikv. vergunningen onderhoudsbaggerwerken Schelde. Rapport: Geluidsniveaumetingen 03/03/2008 - 18/03/2008. Vlaamse Overheid. Afdeling Maritieme Toegang: Zeebrugge. Multiple paging pp., more
  • GEMS International (2008). Analyse impact baggerboot ikv. vergunningen onderhoudsbaggerwerken Schelde. Rapport: Mobiele sediment meetcampagne 03/03/2008 - 06/03/2008; Stationaire sediment meetcampagne 03/03/2008 - 24/03/2008. Vlaamse Overheid. Afdeling Maritieme Toegang: Zeebrugge. Multiple paging pp., more
  • Vercammen, L.; Backers, W.; Bertels, C.; Decock, L. (2008). Antwerpen Deurganckdok: densiteitsprikken. Agentschap voor Maritieme Dienstverlening en Kust. Afdeling Kust: Oostende. maps, graphs pp., more
  • International Marine and Dredging Consultants; WL | Delft Hydraulics; GEMS International (2007). Uitbreiding studie densiteitsstromingen in de Beneden Zeeschelde in het kader van de LTV meetcampagne naar hooggeconcentreerde slibsuspensies: deelrapport 10. Aanvullende slibparameters zomer 2006. Versie 2.0. Waterbouwkundig Laboratorium: Antwerpen. III, 31 + appendices pp., more
  • International Marine and Dredging Consultants; WL | Delft Hydraulics; GEMS International (2007). Uitbreiding studie densiteitsstromingen in de Beneden Zeeschelde in het kader van LTV meetcampagne naar hooggeconcentreerde slibsuspensie: deelrapport 11.5. 28 september 2006 Parel II - Schelle. Versie 2.0. Waterbouwkundig Laboratorium: Antwerpen. IV, 29 + appendices pp., more
  • GEMS International; International Marine and Dredging Consultants; Waterbouwkundig Laboratorium (2006). Meetcampagne in kader van aanslibbingsproblematiek haven en jachthavens van Nieuwpoort: rapport 1. Langdurige CTD-metingen d.d. juli 2005 t.e.m. Januari 2006 te Nieuwpoort. Version 2.0. Waterbouwkundig Laboratorium: Borgerhout. IV, 26 + appendices, cd-rom (data) pp., more
  • GEMS International; International Marine and Dredging Consultants; Waterbouwkundig Laboratorium (2006). Meetcampagne in kader van aanslibbingsproblematiek haven en jachthavens van Nieuwpoort: rapport 2. Dertienuurs ADCP snelheidsmeetcampagne d.d. 6 oktober 2005 te Nieuwpoort. Version 2.0. Waterbouwkundig Laboratorium: Borgerhout. IV, 19 + appendices pp., more
  • GEMS International; International Marine and Dredging Consultants; Waterbouwkundig Laboratorium (2006). Meetcampagne in kader van aanslibbingsproblematiek haven en jachthavens van Nieuwpoort: rapport 3. Aanvullende dertienuurs drijvermeetcampagne d.d. 21 november 2005 te Nieuwpoort. Version 2.0. Waterbouwkundig Laboratorium: Borgerhout. III, 14 + appendices pp., more
  • GEMS International; International Marine and Dredging Consultants; Waterbouwkundig Laboratorium (2006). Meetcampagne in kader van aanslibbingsproblematiek haven en jachthavens van Nieuwpoort: rapport 4. Aanvullende sedimentconcentratiemetingen d.d. 6 oktober 2006 te Nieuwpoort. Version 2.0. Waterbouwkundig Laboratorium: Borgerhout. II, 11 pp., more

Projects (7)  Top | Publications 
  • HCBS1: Uitbreiding studie densiteitsstromingen in de Beneden Zeeschelde in het kader van LTV Meetcampagne naar hooggeconcentreerde slibsuspensies, more
  • HCBS2: Uitbreiding studie densiteitsstromingen in de Beneden Zeeschelde in het kader van LTV Meetcampagne naar hooggeconcentreerde slibsuspensies: herhaling meetcampagne, more
  • Langdurige monitoring van zout/zoet-verdeling in de haven van Zeebrugge en monitoring van zoutconcentratie, slibconcentratie en hooggeconcentreerde slibsuspensies in de Belgische kustzone, more
  • Maintenance Dredging: Belgian Coast and Harbours, more
  • Meetcampagne in het kader van aanslibbingsproblematiek haven en jachthavens van Nieuwpoort, more
  • Mobiele metingen Zeebrugge : verwerken van de turbiditeits- en snelheidsmetingen, more
  • The effect of ocean acidification on the benthic ecosystem, more

All data in IMIS is subject to the VLIZ privacy policy Top | Publications | Projects