Latusek-Nabholz, Jennifer |
HDR Environmental, Operations and Construction, Inc., more
Direct contact at institute:
E-mail:
| |
- Acoustic Detections for Airborne Mine Neutralization System Passive Acoustic Monitoring in the NSWC PCD Study Area from December 2011, more
- Sightings for Airborne Mine Neutralization System Aerial Monitoring in the NSWC PCD Study Area from October 2011, 2012, more
- Sightings for Airborne Mine Neutralization System Vessel Monitoring in the NSWC PCD Study Area from December 2011, more
- Sightings for AN/AQS-20 Sonar Aerial Monitoring in the NSWC PCD Study Area from July 2011 and May 2012, more
- Sightings for AN/AQS-20 Sonar Test Event - April-May 2013, more
- Sightings for AN/AQS-20 Sonar Test Event - December 2013, more
- Sightings for REMUS Sonar Test Event - July 2013, more
- Sightings for SSAM2-BOSS Sonar Test Event - June 2013, more
|
|