IMIS

Publications | Institutes | Persons | Datasets | Projects | Maps
[ report an error in this record ]basket (1): add | show Print this page

one publication added to basket [126140]
Slepen en zinken van het Ninian Central Platform van 600.000 ton = Le remorquage et la mise en place de la Ninian Central Platform de 600.000 tonnes
(1979). Slepen en zinken van het Ninian Central Platform van 600.000 ton = Le remorquage et la mise en place de la Ninian Central Platform de 600.000 tonnes. Excavator - Trenco (Ed. biling.) 5: 6-21
In: Excavator. Trenco: Overijse. ISSN 1781-0051, more

Available in

Keywords
    Work platforms > Drilling platforms
    Marine/Coastal

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top