IMIS | Flanders Marine Institute
 

Flanders Marine Institute

Platform for marine research

IMIS

Publications | Institutes | Persons | Datasets | Projects | Maps
[ report an error in this record ]basket (0): add | show Printer-friendly version

JCOMM/IODE expert team for data management practices, the implementation of E2EDM technology
IOC/IODE (2006). JCOMM/IODE expert team for data management practices, the implementation of E2EDM technology. IOC Project Office for IODE: Belgium. 7 pp.

Available in Author 
Document type: Meeting report

Keywords
    Technology; Marine

Author  Top 
  • IOC/IODE

Abstract
    The “end to end” data management (E2EDM) system is considered as thecoordinated and inter-connected combination of the following basic components:- the ocean and marine meteorological data management systems (local datasystem systems) which are operated and being developed under various ocean studyprograms and services;.- the integration technology as an “umbrella” that comprises local datasystems and provides communication and “transparent” interaction betweenmetadata, data and products resulted from these local data systems and also an enduseraccess to any data and information generated by systems.In 2004-2006 the prototype of the E2EDM system was developed under theJCOMM/IODE ETDMP Pilot Project III.The four data sources (10 information resources) were provided by VLIZ(Belgium), RIHMI-WDC (Russian Federation), Met Office (United Kingdom) andIFREMER (France) for domain covering oceanographic and marine meteorologicalobservation data and product.

All data in IMIS is subject to the VLIZ privacy policy Top | Author