IMIS | Flanders Marine Institute
 

Flanders Marine Institute

Platform for marine research

IMIS

Publications | Institutes | Persons | Datasets | Projects | Maps
[ report an error in this record ]basket (0): add | show Printer-friendly version

Challenges in the design of the New Lock Terneuzen
Aerts, F.; De Winne, K. (2015). Challenges in the design of the New Lock Terneuzen, in: SMART RIVERS 2015, Buenos Aires, Argentina, 7-11 September 2015: papers booklet. pp. [1-14]
In: (2015). SMART RIVERS 2015, Buenos Aires, Argentina, 7-11 September 2015: papers booklet. PIANC: Brussels. , more

Available in Authors 

Keywords
    Design; ANE, Netherlands, Terneuzen Locks

Authors  Top 
  • Aerts, F., more
  • De Winne, K.

Abstract
    The lock complex at Terneuzen is the most important gateway to the ports of Terneuzen and Ghent and provides a shipping link between the Netherlands, Belgium and France. The project team New Lock Ghent-Terneuzen of the Flemish-Dutch Scheldt Commission currently works full-speed in preparation for a new, large lock within the existing lock complex. On completion the new lock will rank among the ten largest locks in the world.

All data in IMIS is subject to the VLIZ privacy policy Top | Authors