Masterplan Antwerpen - Oosterweelverbinding - Tunnel: studierapport 2D hydrodynamic model of the Scheldt: model scenarios during the construction of the tunnel
TVSAM - Studiegroep Antwerpen Mobiel (2004). Masterplan Antwerpen - Oosterweelverbinding - Tunnel: studierapport 2D hydrodynamic model of the Scheldt: model scenarios during the construction of the tunnel. Versie A. BAM: Antwerpen. 22 pp.

Available in  Author 
Document type: Project report

Keywords