IMIS

Publications | Institutes | Persons | Datasets | Projects | Maps
[ report an error in this record ]basket (1): add | show Print this page

one publication added to basket [25973]
Pre-trenching, pre-sweeping and backfilling for the 36" Offshore Pipeline Project in Taiwan
van Melkebeek, E. (2002). Pre-trenching, pre-sweeping and backfilling for the 36" Offshore Pipeline Project in Taiwan. Terra et Aqua 87: 19-25
In: Terra et Aqua: International Journal on Public Works, Ports and Waterways Developments. International Association of Dredging Companies (IADC): The Hague. ISSN 0376-6411, more
Peer reviewed article  

Available in  Author 

Keywords
    Backfilling
    Backfilling
    Construction > Pipeline construction
    Dimensions > Depth > Water depth
    Resource management > Water management > Backfilling
    Trenching
    Vehicles > Surface craft > Dredgers
    Taiwan [Marine Regions]

Author  Top 
  • van Melkebeek, E.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Author